Aim of the run
Aim of the run
During this beam run the complex assembling and start of all detectors
is planned:
- Installation of the beam stability system
- Assembling and final calibration of the first half of the
electromagnetic calorimeter (6x7 supermodules);
- Installation of proportional chambers;